DS MAX

DS MAX Sky City

The 19 floor luxurious DS-MAX SKYCITY is a 3-bedroom apartment, an ultra-modern development with super-luxurious amenities, is located in the much sought after location of Thanisandra, near Manyata Tech Park. We The Power Solutions Have successfully executed the HT Installation of 3 x 500 KVA transformer substation and have got approval from BESCOM and Electrical Inspectorate. The Materials is supplied by us which are BESCOM approved and are of high quality.

Load: 1690 KW

HT Electrical Installation: 3 x 500 KVA transformer substation installation done and commissioned.

https://www.dsmaxproperties.com/

DS MAX Spark Nest

DS-MAX Spark Nest is located off Thanisandra main road (near Manipal academy of banking). The neighborhood is surrounded by IT firms and premier educational institutes. As a result of proximity to Manyata Tech Park you can expect high rental income and appreciation value for the property. 1 x 500 KVA TC Substation installation work is done by us and commissioned.

Load: 423 KW

HT Installation: 1 x 500KVA TC Sub Station work

Floors: G + 3UF’s

https://www.dsmaxproperties.com/

DS MAX Star Nest

DS-MAX SATELLITE is a G+3 floor construction located conveniently at Kengeri Satellite Town, Bangalore. Namma Metro, which connects to M.G Road, is an added advantage to the residents of this project, as it offers a fast and hassle free journey to other parts of the city.

Load: 522 KW

HT Installation: 1 x 500KVA transformer substation.

https://www.dsmaxproperties.com/

DS MAX Statelight

Load:486 KW

HT Installation: 1 x 500KVA TC Sub Station Installation work done.

https://www.dsmaxproperties.com/

JRC PROJECTS

JRC WILD WOOD

JRC Wild Wood is located Rayasandra Village (Sarjapura Hobli) Anekal Taluk. We The Power Solutions Have successfully executed the LT Installation 4 x 500 KVA TC Substation installation work is done by us and commissioned.

Load: 2456 KW (2889 KVA)

LT Installation: 4 x 500KVA TC Sub Station Work

Layout Area: 12 Acres 21 Guntas (50686.89Sqmtrs)

 

JRC POLLADIO​

JRC Projects-1 Rep by: Sri B.C Manohar Reddy is located BillChikkanhalli  Village (Sarjapura Hobli) Anekal Taluk. We The Power Solutions Have successfully executed the LT Installation 5 x 250 KVA TC Substation installation work is done by us and commissioned.

Load: 1391 KW (1636 KVA)

LT Installation: 5 x 250KVA TC Sub Station Work

Layout Area: 12 Acres 26.4 Guntas (156 Sites)

JRC POLLADIO

JRC Projects-2 Rep by: Sri B.C Manohar Reddy is located BillChikkanhalli  Village (Sarjapura Hobli) Anekal Taluk. We The Power Solutions Have successfully executed the LT Installation 4 x 250 KVA TC Substation installation work is done by us and commissioned.

Load: 1032 KW (1332 KVA)

LT Installation: 4 x 250KVA TC Sub Station Work

Layout Area: 12 Acres 36 Guntas (165 Sites)

J R HOUSING DEVELOPERS PVT LTD

J R HOUSING

J R Housing Developers Pvt Ltd Rep by: Smt. S. Srilekha is located Chikkagattiganabbe Village (Hoskote O&M Unit) Hoskote. We The Power Solutions Have successfully executed the LT Installation 1 x 250 KVA Oil TC Substation installation work is done by us and commissioned.

Load: 216 KW

LT Installation: 1 x 250KVA Oil TC Sub Station work

Layout Area: 33 Sites

J R HOUSING

J R Housing Developers Pvt Ltd Rep by: M/s. Niranjan Reddy is located Jinnagara Village (Jadigenahalli O&M Unit) Hoskote. We The Power Solutions Have successfully executed the LT Installation 8 x 250 KVA TC Substation installation work is done by us and commissioned.

Load: 2400 KW (2824 KVA)

LT Installation: 8 x 250KVA Oil TC Sub Station work

Layout Area: 28 Acres 16 Guntas (389 Sites)

J R HOUSING

J R Housing Developers Pvt Ltd Rep by: M/s. Niranjan Reddy Phase 2 is located Iggaluru Village (Attibele Hobli) Hoskote. We The Power Solutions Have successfully executed the LT Installation 1 x 250 KVA TC Substation installation work is done by us and commissioned.

Extent 304 KW (358 KVA) – Existing Load 841 KW (989 KVA)

Total Load: 1145 KW (1362 KVA)

LT Installation: 1 x 250KVA TC Sub Station work

Layout Area: 2 Acres 39 Guntas (42 Sites)

MANYATA DEVELOPERS PVT LTD

MANYATA MID LANDS

M/s. Reddy Veeranna Constructions Rep by: Venkataramana is located Guddanahalli Village (Kasaba Hobli) Anekal Taluk. We The Power Solutions Have successfully executed the LT Installation 10 x 250 KVA TC Substation installation work is done by us and commissioned.

Load: 2952 KW (3473 KVA)

LT Installation: 10 x 250KVA TC Sub Station Work

Layout Area: 29 Acres 2.5 Guntas (485 Sites)

MANYATA PHASE 1

M/s. Manyata Developers Pvt Ltd Rep by: Sri Abhiram Parvathanenl is located Neriga Village (Attibele) Anekal Taluk, Chandapura. We The Power Solutions Have successfully executed the LT Installation 2 x 250 KVA + 2 x 500 KVA TC Substation installation work is done by us and commissioned.

Load: 1699 KW (1999 KVA)

LT Installation: 2 x 250 KVA + 2 x 500 KVA TC Sub Station Work

Layout Area: 247 Sites

MANYATA PHASE 2

M/s. Manyata Developers Pvt Ltd Rep by: Smt Sangeetha, GPA Holder of Owners Sri Bandari Balakrishna Narayan and Others Sy No. 33/12 & 37 is located illthore Village (Kundana Hobli) Devanahalli Taluk. We The Power Solutions Have successfully executed the LT Installation 1 x 250 KVA TC Substation installation work is done by us and commissioned.

Load: 317 KW

LT Installation: 1 x 250 KVA TC Sub Station Work

Layout Area:  50 Sites

MANYATA PHASE 3

M/s. Manyata Developers Pvt Ltd Rep by: Sri Venkataramana is located illthore Village (Kundana Hobli) Devanahalli Taluk. We The Power Solutions Have successfully executed the LT Installation 7 x 250 KVA TC Substation installation work is done by us and commissioned.

Load: 2099 KW (2470 KVA)

LT Installation: MCVCB Feeder Panel & other allied works at 66/11 KV, 7 x 250KVA Oil TC Sub Station Work

Layout Area: 30 Acres

MANYATA PHASE 4A

M/s. Manyata Developers Pvt Ltd Rep by: Smt. Sangeetha & Smt. Suguna, Sy No.41/1, 41/2, 194/1, 194/2, 194/7 is located illthore Village (Kundana Hobli) Devanahalli Taluk. We The Power Solutions Have successfully executed the LT Installation 2 x 250 KVA TC Substation installation work is done by us and commissioned.

Load: 607 KW (714 KVA)

LT Installation: 2 x 250KVA Oil TC Sub Station Work

Layout Area: 7 Acres 31 Guntas

MANYATA PHASE 4B

M/s. Manyata Developers Pvt Ltd Rep by: Smt. Sangeetha & others Sy No.34/3, 35, 117/3, 117/4 is located illthore Village (Kundana Hobli) Devanahalli Taluk. We The Power Solutions Have successfully executed the LT Installation 2 x 250 KVA TC Substation installation work is done by us and commissioned.

Load: 640 KW (753 KVA)

LT Installation: 2 x 250KVA Oil TC Sub Station Work

Layout Area: 10 Acres 17 Guntas (78 Sites)

ASHWANI Properties

ASHWANI PROPERTIES SITARA

Work done: 4 x 250KVA Tc Sub Station Installation.

ASHWANI SUNSHINE

Work Done: 2 x 500KVA Tc Sub Station Installation.

ASHWANI AEESHA

Work Done: 3 x 250 KVA TC Sub Station Installation

RITANAND BALVED EDUCATION FOUNDATION

RITANAND BALVED EDUCATION FOUNDATION

                 M/s. Ritanand Balved Education Foundation is located Beerasandra Village,                         (Kundana Hobli) Devanahalli Taluk, Bangalore North . We The Power Solutions Have                        successfully executed the HT Installation 1 x 2500 KVA TC Substation installation work is done by us and commissioned.

Load: 1000 KVA (School)

HT Installation: HTMSB 1 x 2500 KVA – 11KV/433V TC Sub Station Work

Layout Area: HTMSB Academic Block – LG + GF + 3 UFs

RITANAND BALVED EDUCATION FOUNDATION

M/s. Ritanand Balved Education Foundation is located Beerasandra Village and Alur Duddanahalli Village, (Kundana Hobli) Devanahalli Taluk, Bangalore North . We The Power Solutions Have successfully executed the HT Installation 1 x 2500 KVA TC Substation installation work is done by us and commissioned.

Load: 1500 KVA (College)

HT Installation: HTMSB 1 x 2500 KVA – 11KV/433V TC Sub Station Work

Layout Area: HTMSB Academic Block-Block 2 – BF + GF + 6 UFs + TF

PROJECTS

JAYASURYA DEVELOPERS

M/s. Jayasurya Developers Pvt Ltd Rep by: Sri H Gopal Reddy Alias Gopi is located Agrahara Village (Yelahanka Hobli) Bangalore. We The Power Solutions Have successfully executed the LT Installation 6 x 250 KVA TC Substation installation work is done by us and commissioned.

Load: 1699 KW

LT Installation: 6 x 250KVA Oil TC Sub Station Work

Layout Area: 22 Acres 3.70 Guntas (304 Sites)

SAMMY’S DREAMLAND CO. PVT LTD

M/s. Sammy’s Dreamland Co. Pvt GPA Holder M/s. Puravankar Ltd (MS Building Apartment) is located Hosahalli Village (Jala Hobli) Devanahalli, Bangalore North Taluk. We The Power Solutions Have successfully executed the LT Installation 1 x 250 + 01 x 100 KVA Cable Entry Type TC Substation installation work is done by us and commissioned.

Load: 4426 KW (5207 KVA)

LT Installation: 09 x 500 KVA Oil TC Sub Station Work

Layout Area:  2 Block 12 Towers (873 Nos)

NVT QUALITY LIFESTYLE ESTATE LLP

M/s. NVT Quality Lifestyle Estate LLP Rep by: Vivek Grag & Tanuj Garg (Developers), Sri Sunil Sathyanarayana & Others (Owners) is located Chambenahalli & Kallahalli Village (Sarjapura Hobli) Anekal Taluk. We The Power Solutions Have successfully executed the LT Installation 3 x 500 KVA TC Substation installation work is done by us and commissioned.

Load: 1895 KW (2229 KVA)

LT Installation: 3 x 500KVA TC Sub Station Work Layout Area: 18 Acres 24.25 Guntas (75295.77Sqmtrs) GF + 1st UF + Terrace

NITESH COLUMBUS SQUARE

M/s. Nitesh Columbus Square is located Kattigenahalli Village (Yelahanka). We The Power Solutions Have successfully executed the LT Installation 3 x 500 KVA & 1 x 250 KVA TC Substation installation work is done by us and commissioned.

Load: 1991 KW (107 KVA)

LT & HT Installation: 3 x 500KVA + 1 x 250KVA (Oil Type DTC) TC Sub Station work

Floors: G + 11 UF’s

ROMAN BUILDERS (DEVELOPERS)

M/s. Roman Builders (Developers) Rep by: Sri Manjunath V & Sri Rohith Reddy is located Baguru Village (Anugondanahalli Hobli) Hoskote Taluk. We The Power Solutions Have successfully executed the LT Installation 14 x 250 KVA TC Substation installation work is done by us and commissioned.

Load: 3405 KW (4005 KVA)

LT Installation: 14 x 250KVA TC Sub Station Work

Layout Area: 41 Acres 25 Guntas

ROHAN BUILDERS

M/s. Rohan Builders Rep by: Sri Balaraj and others is located Kyalasanahalli Village KR Puram Bangalore. We The Power Solutions Have successfully executed the LT Installation 2 x 500 KVA Oil TC Substation installation work is done by us and commissioned.

                           Load: 2531 KW (2978 KVA)                             

LT Installation: 2 x 500KVA Oil TC Sub Station Work

Multistory Building

OCEANUS DWELLINGS PVT LTD

M/s. ST Teresa Novitiate Society GPA Oceanus Dwellings Pvt. Ltd., Rep by: V Narasimha Reddy is located No.16, ajacent Forum, neighbourhood Whitefield . We The Power Solutions Have successfully executed the LT Installation 4 x 500 KVA Oil TC Substation installation work is done by us and commissioned.

Load: 2048 KW

LT Installation: 4 x 500KVA Oil TC Sub Station Work

                               Layout Area: 53585.470Sqmtrs                               LBF + UBF + GF + FF + SF + TF + 4th F To 18TH F + Terrace

E ZONE CLUB

Work done: 4 x 250KVA Tc Sub Station Installation.

KEMS FORGING

1 x 2000 kva TC Sub Station work Industry

Pillagumpa Industrial Area Hoskote.

SAMPATH RAJ INDUSTRIES

Work Done: 1 x 250 KVA TC Sub Station installation.

Sun Edu College campus Sugatta

Work done: 1 x 250KVA TC Sub Station Installation

TMR Developers Orchids Sampigehalli and Kogilu

Work done: 1 x 250KVA Tc Sub Station Installation and Villas electrification

http://tmrdevelopers.com/

Preeti Developers

Elements 5

Work done: 4 x 250KVA Tc Sub Station Installation.

Preeti Proximity

Work Done: 2 x 500KVA Tc Sub Station Installation.

Noves Square

Work Done: 3 x 250 KVA TC Sub Station Installation

PREETHI DEVELOPERS PVT LTD

M/s. Preethi Developers Pvt Ltd Rep by: M Rama Rangeeshwara Reddy Sy No.17/1 is located Byanahalli Village (Jala Hobli) Bangalore North Taluk. We The Power Solutions Have successfully executed the LT Installation 1 x 250 + 01 x 100 KVA Cable Entry Type TC Substation installation work is done by us and commissioned.

Load: 260 KW (306 KVA)

LT Installation: 1 x 250 KVA + 1 x 100 KVA TC Sub Station Work

Layout Area:  2 Acres 18 Guntas

On Going Projects

DS MAX

Sonata

Load:630KW

HT Installation: 1x 250KVA and 1 x 500 KVA TC Sub Station installation. (On Going Proje

Floors: G + 4 UF

https://www.dsmaxproperties.com/

Our TPS

Social Services

Photos of food donation during second lock down

Our TPS

Transformer donation to Sri Kshetra Dharmastala in association with Vijay Electricals

Our TPS

The power solutions Donated 15 no’s Laptops to Hebbal Kempapura Govt School associates with Raj power, Vijaya electricals, Royal power systems