The 19 floor luxurious DS-MAX SKYCITY is a 3-bedroom apartment, an ultra-modern development with super-luxurious amenities, is located in the much sought after location of Thanisandra, near Manyata Tech Park. We The Power Solutions Have successfully executed the HT Installation of 3 x 500 KVA transformer substation and have got approval from BESCOM and Electrical Inspectorate. The Materials is supplied by us which are BESCOM approved and are of high quality.
Load: 1690 KW
HT Electrical Installation: 3 x 500 KVA transformer substation installation done and commissioned.
DS-MAX Spark Nest is located off Thanisandra main road (near Manipal academy of banking). The neighborhood is surrounded by IT firms and premier educational institutes. As a result of proximity to Manyata Tech Park you can expect high rental income and appreciation value for the property. 1 x 500 KVA TC Substation installation work is done by us and commissioned.
Load: 423 KW
HT Installation: 1 x 500KVA TC Sub Station work
Floors: G + 3UF’s
DS-MAX SATELLITE is a G+3 floor construction located conveniently at Kengeri Satellite Town, Bangalore. Namma Metro, which connects to M.G Road, is an added advantage to the residents of this project, as it offers a fast and hassle free journey to other parts of the city.
Load: 522 KW
HT Installation: 1 x 500KVA transformer substation.
Load:486 KW
HT Installation: 1 x 500KVA TC Sub Station Installation work done.
JRC Wild Wood is located Rayasandra Village (Sarjapura Hobli) Anekal Taluk. We The Power Solutions Have successfully executed the LT Installation 4 x 500 KVA TC Substation installation work is done by us and commissioned.
Load: 2456 KW (2889 KVA)
LT Installation: 4 x 500KVA TC Sub Station Work
Layout Area: 12 Acres 21 Guntas (50686.89Sqmtrs)
JRC Projects-1 Rep by: Sri B.C Manohar Reddy is located BillChikkanhalli Village (Sarjapura Hobli) Anekal Taluk. We The Power Solutions Have successfully executed the LT Installation 5 x 250 KVA TC Substation installation work is done by us and commissioned.
Load: 1391 KW (1636 KVA)
LT Installation: 5 x 250KVA
TC Sub Station Work
Layout Area: 12 Acres
26.4 Guntas (156 Sites)
JRC Projects-2 Rep by: Sri B.C Manohar Reddy is located BillChikkanhalli Village (Sarjapura Hobli) Anekal Taluk. We The Power Solutions Have successfully executed the LT Installation 4 x 250 KVA TC Substation installation work is done by us and commissioned.
Load: 1032 KW (1332 KVA)
LT Installation: 4 x 250KVA TC Sub Station Work
Layout Area: 12 Acres 36 Guntas (165 Sites)
J R Housing Developers Pvt Ltd Rep by: Smt. S. Srilekha is located Chikkagattiganabbe Village (Hoskote O&M Unit) Hoskote. We The Power Solutions Have successfully executed the LT Installation 1 x 250 KVA Oil TC Substation installation work is done by us and commissioned.
Load: 216 KW
LT Installation: 1 x 250KVA Oil TC Sub Station work
Layout Area: 33 Sites
J R Housing Developers Pvt Ltd Rep by: M/s. Niranjan Reddy is located Jinnagara Village (Jadigenahalli O&M Unit) Hoskote. We The Power Solutions Have successfully executed the LT Installation 8 x 250 KVA TC Substation installation work is done by us and commissioned.
Load: 2400 KW (2824 KVA)
LT Installation: 8 x 250KVA Oil TC Sub Station work
Layout Area: 28 Acres 16 Guntas (389 Sites)
J R Housing Developers Pvt Ltd Rep by: M/s. Niranjan Reddy Phase 2 is located Iggaluru Village (Attibele Hobli) Hoskote. We The Power Solutions Have successfully executed the LT Installation 1 x 250 KVA TC Substation installation work is done by us and commissioned.
Extent 304 KW (358 KVA) – Existing Load 841 KW (989 KVA)
Total Load: 1145 KW (1362 KVA)
LT Installation: 1 x 250KVA TC Sub Station work
Layout Area: 2 Acres 39 Guntas (42 Sites)
M/s. Reddy Veeranna Constructions Rep by: Venkataramana is located Guddanahalli Village (Kasaba Hobli) Anekal Taluk. We The Power Solutions Have successfully executed the LT Installation 10 x 250 KVA TC Substation installation work is done by us and commissioned.
Load: 2952 KW (3473 KVA)
LT Installation: 10 x 250KVA TC Sub Station Work
Layout Area: 29 Acres 2.5 Guntas (485 Sites)
M/s. Manyata Developers Pvt Ltd Rep by: Sri Abhiram Parvathanenl is located Neriga Village (Attibele) Anekal Taluk, Chandapura. We The Power Solutions Have successfully executed the LT Installation 2 x 250 KVA + 2 x 500 KVA TC Substation installation work is done by us and commissioned.
Load: 1699 KW (1999 KVA)
LT Installation: 2 x 250 KVA + 2 x 500 KVA TC Sub Station Work
Layout Area: 247 Sites
M/s. Manyata Developers Pvt Ltd Rep by: Smt Sangeetha, GPA Holder of Owners Sri Bandari Balakrishna Narayan and Others Sy No. 33/12 & 37 is located illthore Village (Kundana Hobli) Devanahalli Taluk. We The Power Solutions Have successfully executed the LT Installation 1 x 250 KVA TC Substation installation work is done by us and commissioned.
Load: 317 KW
LT Installation: 1 x 250 KVA TC Sub Station Work
Layout Area: 50 Sites
M/s. Manyata Developers Pvt Ltd Rep by: Sri Venkataramana is located illthore Village (Kundana Hobli) Devanahalli Taluk. We The Power Solutions Have successfully executed the LT Installation 7 x 250 KVA TC Substation installation work is done by us and commissioned.
Load: 2099 KW (2470 KVA)
LT Installation: MCVCB Feeder Panel & other allied works at 66/11 KV, 7 x 250KVA Oil TC Sub Station Work
Layout Area: 30 Acres
M/s. Manyata Developers Pvt Ltd Rep by: Smt. Sangeetha & Smt. Suguna, Sy No.41/1, 41/2, 194/1, 194/2, 194/7 is located illthore Village (Kundana Hobli) Devanahalli Taluk. We The Power Solutions Have successfully executed the LT Installation 2 x 250 KVA TC Substation installation work is done by us and commissioned.
Load: 607 KW (714 KVA)
LT Installation: 2 x 250KVA Oil TC Sub Station Work
Layout Area: 7 Acres 31 Guntas
M/s. Manyata Developers Pvt Ltd Rep by: Smt. Sangeetha & others Sy No.34/3, 35, 117/3, 117/4 is located illthore Village (Kundana Hobli) Devanahalli Taluk. We The Power Solutions Have successfully executed the LT Installation 2 x 250 KVA TC Substation installation work is done by us and commissioned.
Load: 640 KW (753 KVA)
LT Installation: 2 x 250KVA Oil TC Sub Station Work
Layout Area: 10 Acres 17 Guntas (78 Sites)
Work done: 4 x 250KVA Tc Sub Station Installation.
Work Done: 2 x 500KVA Tc Sub Station Installation.
Work Done: 3 x 250 KVA TC Sub Station Installation
M/s. Ritanand Balved Education Foundation is located Beerasandra Village, (Kundana Hobli) Devanahalli Taluk, Bangalore North . We The Power Solutions Have successfully executed the HT Installation 1 x 2500 KVA TC Substation installation work is done by us and commissioned.
Load: 1000 KVA (School)
HT Installation: HTMSB 1 x 2500 KVA – 11KV/433V TC Sub Station Work
Layout Area: HTMSB Academic Block – LG + GF + 3 UFs
M/s. Ritanand Balved Education Foundation is located Beerasandra Village and Alur Duddanahalli Village, (Kundana Hobli) Devanahalli Taluk, Bangalore North . We The Power Solutions Have successfully executed the HT Installation 1 x 2500 KVA TC Substation installation work is done by us and commissioned.
Load: 1500 KVA (College)
HT Installation: HTMSB 1 x 2500 KVA – 11KV/433V TC Sub Station Work
Layout Area: HTMSB Academic Block-Block 2 – BF + GF + 6 UFs + TF
M/s. Jayasurya Developers Pvt Ltd Rep by: Sri H Gopal Reddy Alias Gopi is located Agrahara Village (Yelahanka Hobli) Bangalore. We The Power Solutions Have successfully executed the LT Installation 6 x 250 KVA TC Substation installation work is done by us and commissioned.
Load: 1699 KW
LT Installation: 6 x 250KVA Oil TC Sub Station Work
Layout Area: 22 Acres 3.70 Guntas (304 Sites)
M/s. Sammy’s Dreamland Co. Pvt GPA Holder M/s. Puravankar Ltd (MS Building Apartment) is located Hosahalli Village (Jala Hobli) Devanahalli, Bangalore North Taluk. We The Power Solutions Have successfully executed the LT Installation 1 x 250 + 01 x 100 KVA Cable Entry Type TC Substation installation work is done by us and commissioned.
Load: 4426 KW (5207 KVA)
LT Installation: 09 x 500 KVA Oil TC Sub Station Work
Layout Area: 2 Block 12 Towers (873 Nos)
M/s. NVT Quality Lifestyle Estate LLP Rep by: Vivek Grag & Tanuj Garg (Developers), Sri Sunil Sathyanarayana & Others (Owners) is located Chambenahalli & Kallahalli Village (Sarjapura Hobli) Anekal Taluk. We The Power Solutions Have successfully executed the LT Installation 3 x 500 KVA TC Substation installation work is done by us and commissioned.
Load: 1895 KW (2229 KVA)
LT Installation: 3 x 500KVA TC Sub Station Work Layout Area: 18 Acres 24.25 Guntas (75295.77Sqmtrs) GF + 1st UF + Terrace
M/s. Nitesh Columbus Square is located Kattigenahalli Village (Yelahanka). We The Power Solutions Have successfully executed the LT Installation 3 x 500 KVA & 1 x 250 KVA TC Substation installation work is done by us and commissioned.
Load: 1991 KW (107 KVA)
LT & HT Installation: 3 x 500KVA + 1 x 250KVA (Oil Type DTC) TC Sub Station work
Floors: G + 11 UF’s
M/s. Roman Builders (Developers) Rep by: Sri Manjunath V & Sri Rohith Reddy is located Baguru Village (Anugondanahalli Hobli) Hoskote Taluk. We The Power Solutions Have successfully executed the LT Installation 14 x 250 KVA TC Substation installation work is done by us and commissioned.
Load: 3405 KW (4005 KVA)
LT Installation: 14 x 250KVA TC Sub Station Work
Layout Area: 41 Acres 25 Guntas
M/s. Rohan Builders Rep by: Sri Balaraj and others is located Kyalasanahalli Village KR Puram Bangalore. We The Power Solutions Have successfully executed the LT Installation 2 x 500 KVA Oil TC Substation installation work is done by us and commissioned.
Load: 2531 KW (2978 KVA)
LT Installation: 2 x 500KVA Oil TC Sub Station Work
Multistory Building
M/s. ST Teresa Novitiate Society GPA Oceanus Dwellings Pvt. Ltd., Rep by: V Narasimha Reddy is located No.16, ajacent Forum, neighbourhood Whitefield . We The Power Solutions Have successfully executed the LT Installation 4 x 500 KVA Oil TC Substation installation work is done by us and commissioned.
Load: 2048 KW
LT Installation: 4 x 500KVA Oil TC Sub Station Work
Layout Area: 53585.470Sqmtrs LBF + UBF + GF + FF + SF + TF + 4th F To 18TH F + Terrace
Work done: 4 x 250KVA Tc Sub Station Installation.
1 x 2000 kva TC Sub Station work Industry
Pillagumpa Industrial Area Hoskote.
Work Done: 1 x 250 KVA TC Sub Station installation.
Work done: 1 x 250KVA TC Sub Station Installation
Work done: 1 x 250KVA Tc Sub Station Installation and Villas electrification
Work done: 4 x 250KVA Tc Sub Station Installation.
Work Done: 2 x 500KVA Tc Sub Station Installation.
Work Done: 3 x 250 KVA TC Sub Station Installation
M/s. Preethi Developers Pvt Ltd Rep by: M Rama Rangeeshwara Reddy Sy No.17/1 is located Byanahalli Village (Jala Hobli) Bangalore North Taluk. We The Power Solutions Have successfully executed the LT Installation 1 x 250 + 01 x 100 KVA Cable Entry Type TC Substation installation work is done by us and commissioned.
Load: 260 KW (306 KVA)
LT Installation: 1 x 250 KVA + 1 x 100 KVA TC Sub Station Work
Layout Area: 2 Acres 18 Guntas
Load:630KW
HT Installation: 1x 250KVA and 1 x 500 KVA TC Sub Station installation. (On Going Proje
Floors: G + 4 UF